top of page

The latest addition to the Brinton Lake Corporate Center in Concord Twp, PA required a large cut wall to be installed along North and East edges of the site to accommodate a new retirement facility. Due to property line restrictions, a 3,000 SF portion of the segmental retaining wall was designed with a temporary shotcrete wall to support the cut slope while the SRW would later be attached directly to the soil nails for a uniformed finished product. 

Axis installed 145 soil nails and over 80 CY of shotcrete on schedule allowing Pickering Valley Landscape to continue with the construction of the SRW. 

Brinton Lake

bottom of page